We at mgi infra are proud to be recognized as the pioneers of the revolution in india and are lgsf light gauge steel framing market leaders in offering com.
Light steel frame construction india.
Primary framing members are tapered varying depth built up sections with large depths in the areas of highest stress.
Leading global steel framing technology light and heavy steel gauge framing machines applications for residential commercial and industrial construction.
Light gauge steel frame established in 1996 nipani infra industries pvt.
This light gauge steel frame is developed through a cold formed process without the use of heat.
The sheet surface is coated with a zinc alloy that completely covers the steel surface and seals it from the corrosive action of its environment.
Light gauge steel frame lgsf is a cold rolled load bearing steel framed wall system with an established history as an innovative and reliable construction material in world.
We seamlessly integrate our software technology with our steel rollforming machines to provide durable solutions ranging through single to multi machine high volume applications.
Pre engineered buildings are on the average 30 lighter through the efficient use of steel.
We have started our pre engineered building division.
Characteristics of the lgsf system.
The inherent strength and design flexibility of lgsf construction enables increased spans custom openings curved walls and a variety of external architectural façade.
The light construction lgsf frame is assembled from cold formed galvanized steel profiles.
In the gaps between the elements of the frame heat insulation material is placed and the frame is supplied with surface layers made of various materials forming a layered structure.
Light gauge steel structure system is based on erection of a base structure by assembly of factory made cold formed galvanized light gauge steel sections an.
This process enables steel manufacturers to produce light weight but high tensile steel sheets.
This technology offers many benefits to constructors starting with the most valued being a 1 3 reduction in construction time.