I began laying and now i ran into an area at the base of my staircase that dips in the middle.
Level concrete floor before laminate.
After you have completed the project you have to remove the spacers and clean the floor with a vacuum.
Leveling concrete basement floor before laying laminate.
Apply floor leveling compound to any low areas or dips using a trowel.
Fill any low spots with a cementitious leveling compound following the manufacturer s directions and allow it to dry before proceeding.
The floor may roll a marble and looks to slope now that the carpet has been removed.
Lay laminate flooring on the rest of the concrete floor in the same manner described above.
Feather the edges so they blend in with the surrounding floor.
Typically the floor must be level and uniform within 3 16 inch every 10 feet.
How forgiving is vinyl in regard to an unlevel subfloor.
Another option is use ceramic tile although i think we should still attempt to level it for that as well but i just don t want ceramic tile too hard too cold don t want to spend for radiant heat and i hate hate to see dirtly grout lines.
The maximum laminate flooring level tolerance on a subfloor is 3 16 of an inch over a 10 foot span.
The plywood subfloor is in good condition.
Once you ve leveled your floor you can install the laminate pad.
Remember to pin down the barrier to keep it from shifting around.
Check the specifications on the flooring you ve selected for moisture tolerance.
The floor is not level or square built in the 70 s.
We ve been told that laminate flooring requires the floor to be level but that vinyl flooring is more forgiving.
Before you install file flooring follow the directions above for fixing high spots and low spots in a wood or concrete subfloor.
Then place the pad and get ready to install your laminate flooring.
Wait for the compound to dry prior to laminate installation.
Check the humidity level of basement slab concrete.
Make a final check with the level to be sure all the high and low spots are gone.
I eyeballed mistake the concrete after tearing up carpet to see if it was level for laying laminate.
After installing the moisture barrier select the thickest pad you can get to help level out the floor even more.
Then vacuum the floor with a wet dry vac or sweep it with a broom.
If you re on a concrete subfloor you will need to lay down a moisture barrier before applying the pad.
Work with patience and make sure you don t leave any gaps between the laminate planks.
Check your wood flooring manufacturer s recommendations and sand any high spots with a concrete grinder.